The charging point register lists 11,755 different operators. The 50 largest account for 46 % of all sites between them – the rest is spread across municipal utilities, car dealerships, hotels and one-off installations.
German calibration law requires a charging session to be billed verifiably. Whether that actually works at a given station depends on something the operator files themselves: the public key of the metering capsule. Of 209,136 charge points in the register, 58,501 are checkable (28.0 %). For another 3,169 there is something in the key field, but it is not a key.
| Operator | Charge points | checkable | no key | unusable |
|---|---|---|---|---|
| BP Europa SE | 3,131 | 0.0 % | 3,131 | 0 |
| Mercedes-Benz AG | 2,665 | 0.0 % | 2,665 | 0 |
| Shell Deutschland GmbH | 2,416 | 0.0 % | 2,416 | 0 |
| Pfalzwerke AG | 2,400 | 0.0 % | 2,400 | 0 |
| Team-Emobility GmbH | 2,151 | 0.0 % | 2,151 | 0 |
| Servipark Deutschland GmbH | 1,396 | 0.0 % | 1,396 | 0 |
| Vattenfall Smarter Living GmbH | 1,226 | 0.0 % | 1,226 | 0 |
| REWAG KG | 805 | 0.0 % | 805 | 0 |
| Entega Plus GmbH | 739 | 0.0 % | 485 | 254 |
| EDEKA-MIHA Charge GmbH | 720 | 0.0 % | 720 | 0 |
| STAWAG - Stadt- und Städteregionswerke Aachen AG | 658 | 0.0 % | 658 | 0 |
| Parkraumgesellschaft Baden-Württemberg GmbH | 586 | 0.0 % | 500 | 86 |
The worse case: there is something in the key field – a serial number, a placeholder, truncated characters. On paper the installation looks checkable and is not. What exactly is filed there is shown on the page of the individual charging station.
| Operator | Charge points | unusable |
|---|---|---|
| Flughafen München GmbH | 375 | 285 |
| Entega Plus GmbH | 739 | 254 |
| amperio GmbH | 450 | 97 |
| Parkraumgesellschaft Baden-Württemberg GmbH | 586 | 86 |
| ORLEN Deutschland GmbH | 172 | 63 |
| SolarLoader+ GmbH | 56 | 56 |
| OUTLETCITY AG | 65 | 52 |
| NürnbergMesse GmbH | 226 | 44 |
From 100 charge points upwards (lower table: from 50) – with threecharge points any ratio would be noise. A missing key is not an accusation: older installations were not covered by the filing duty in this form, and not filing does not mean billing wrongly. The figure only says what can be verified.
From 1 invoice checks on this site covering 1 signed charging records across 1 operators. What is checked is whether the amount billed matches what the meter signed – not whether the price is reasonable.
No operator has reached 20 checks yet. Until then nobody is named here: turning three checks, one of which deviated, into a percentage would be an accusation with a decimal place.
From 20 checks per operator, calculated over the last 365 days. A deviation is no proof of intent – it may stem from the tariff someone entered, from a fee the check does not know about, or from an error on either side. What is listed here is a reason to recalculate, not a result.
Only the verdict is stored: operator, number of records and the size of the deviation. Neither the invoice nor the amounts, the charge point identifier or anything about the person checking is kept. There is also a salted one-way value over the records checked – it cannot be reversed and serves only to keep the same invoice from counting towards the rate more than once.
| Operator | Charging stations | Charge points | 50 kW and above | strongest | Key confirmed |
|---|---|---|---|---|---|
| EnBW mobility+ AG und Co.KG | 5,428 | 11,318 | 4,697 | 400 kW | 18 % |
| Tesla Germany GmbH | 3,943 | 3,943 | 3,943 | 500 kW | 66 % |
| E.ON Drive Germany GmbH | 3,187 | 3,906 | 187 | 400 kW | 9 % |
| EWE Go GmbH | 1,735 | 3,287 | 1,227 | 400 kW | 15 % |
| Qwello Deutschland GmbH | 1,630 | 1,908 | 0 | 22 kW | 100 % |
| BP Europa SE | 1,579 | 3,131 | 1,575 | 1,000 kW | 0 % |
| Wirelane Public 1 GmbH | 1,478 | 2,879 | 32 | 50 kW | 99 % |
| Allego GmbH | 1,383 | 2,729 | 1,151 | 400 kW | 78 % |
| Mercedes-Benz AG | 1,362 | 2,665 | 0 | 22 kW | 0 % |
| Servipark Deutschland GmbH | 1,334 | 1,396 | 0 | 22 kW | 0 % |
| ubitricity Gesellschaft für verteilte Energiesysteme mbH | 1,309 | 1,568 | 0 | 22 kW | 97 % |
| IONITY GmbH | 1,301 | 1,488 | 1,301 | 400 kW | 3 % |
| Shell Deutschland GmbH | 1,262 | 2,416 | 1,261 | 420 kW | 0 % |
| Pfalzwerke AG | 1,194 | 2,400 | 951 | 400 kW | 0 % |
| Hamburger Energiewerke Mobil GmbH | 1,170 | 2,342 | 72 | 200 kW | 11 % |
| eze.network GmbH | 1,078 | 2,156 | 0 | 22 kW | 50 % |
| enercity AG | 1,067 | 1,965 | 110 | 400 kW | 17 % |
| TankE GmbH | 1,054 | 1,922 | 109 | 400 kW | 6 % |
| Mer Germany GmbH | 970 | 1,973 | 490 | 400 kW | 44 % |
| Westenergie Metering GmbH | 955 | 1,860 | 8 | 200 kW | 15 % |
| Robert Bosch GmbH | 954 | 1,774 | 34 | 300 kW | 83 % |
| N-ERGIE Aktiengesellschaft | 910 | 1,818 | 30 | 150 kW | 10 % |
| Berliner Stadtwerke KommunalPartner GmbH | 903 | 1,753 | 26 | 200 kW | 25 % |
| Lidl Dienstleistung GmbH & Co. KG | 886 | 2,211 | 667 | 350 kW | 64 % |
| Audi AG | 834 | 1,479 | 29 | 400 kW | 2 % |
| Energie Südbayern GmbH | 811 | 1,582 | 169 | 1,000 kW | 90 % |
| Team-Emobility GmbH | 806 | 2,151 | 31 | 75 kW | 0 % |
| ALDI SÜD Immobilienverwaltungs-GmbH & Co. oHG | 791 | 1,783 | 420 | 200 kW | 35 % |
| E.ON Drive Infrastructure GmbH | 785 | 1,523 | 589 | 400 kW | 49 % |
| SWM Versorgungs GmbH | 757 | 1,487 | 59 | 400 kW | 6 % |
| Stadtwerke Düsseldorf AG | 753 | 1,465 | 36 | 400 kW | 13 % |
| Vattenfall Smarter Living GmbH | 681 | 1,226 | 517 | 400 kW | 0 % |
| Stadtwerke Stuttgart GmbH | 677 | 1,086 | 23 | 300 kW | 2 % |
| Wattif Europe GmbH | 658 | 673 | 4 | 50 kW | 90 % |
| Energielösung GmbH | 637 | 1,168 | 79 | 400 kW | 23 % |
| Citywatt GmbH | 636 | 1,232 | 280 | 600 kW | 89 % |
| TEAG Mobil GmbH | 604 | 1,209 | 398 | 400 kW | 81 % |
| deer GmbH | 586 | 1,115 | 9 | 150 kW | 43 % |
| Tesla Manufacturing Brandenburg SE | 567 | 567 | 0 | 11 kW | 0 % |
| TotalEnergies Charging Solutions Deutschland GmbH | 554 | 1,122 | 312 | 400 kW | 59 % |
| GP Joule Connect GmbH | 542 | 822 | 91 | 400 kW | 64 % |
| ESWE Versorgungs AG | 538 | 1,091 | 31 | 300 kW | 78 % |
| Westfalen Weser Ladeservice GmbH | 538 | 1,052 | 58 | 350 kW | 0 % |
| REWAG KG | 498 | 805 | 15 | 150 kW | 0 % |
| CUBOS Service GmbH | 485 | 1,427 | 77 | 260 kW | 82 % |
| NEW Niederrhein Energie und Wasser GmbH | 470 | 954 | 71 | 400 kW | 5 % |
| Kaufland Dienstleistung GmbH & Co. KG | 466 | 1,128 | 455 | 365 kW | 82 % |
| Regioladen+ GmbH & Co.KG | 465 | 941 | 46 | 300 kW | 18 % |
| Georg Jos. Kaes GmbH | 462 | 492 | 10 | 300 kW | 0 % |
| Dortmunder Energie- und Wasserversorgung GmbH | 453 | 587 | 43 | 400 kW | 0 % |
| Stadtwerke Leipzig GmbH | 435 | 863 | 46 | 400 kW | 14 % |
| EnBW Ostwürttemberg DonauRies AG | 401 | 854 | 29 | 300 kW | 97 % |
| HOCHTIEF Ladepartner GmbH | 393 | 786 | 5 | 200 kW | 96 % |
| Energie- und Wasserversorgung Bonn/Rhein-Sieg GmbH | 375 | 791 | 43 | 400 kW | 30 % |
| naturenergie hochrhein AG | 369 | 846 | 33 | 150 kW | 26 % |
| Entega Plus GmbH | 365 | 739 | 20 | 150 kW | 0 % |
| SachsenEnergie AG | 350 | 754 | 108 | 400 kW | 8 % |
| Mainova AG | 347 | 684 | 49 | 300 kW | 33 % |
| Circle K Deutschland GmbH | 339 | 507 | 334 | 400 kW | 1 % |
| Fraunhofer-Gesellschaft e. V. | 333 | 478 | 5 | 250 kW | 0 % |
| STAWAG - Stadt- und Städteregionswerke Aachen AG | 332 | 658 | 49 | 300 kW | 0 % |
| Q-Park Recharge Germany GmbH | 331 | 387 | 0 | 11 kW | 0 % |
| Energieservice Rhein-Main GmbH | 328 | 656 | 0 | 22 kW | 0 % |
| EDEKA-MIHA Charge GmbH | 325 | 720 | 250 | 150 kW | 0 % |
| HomE of Mobility GmbH | 323 | 481 | 60 | 300 kW | 0 % |
| BS|ENERGY, Braunschweiger Versorgungs-AG & Co. KG | 316 | 624 | 36 | 200 kW | 31 % |
| APCOA Deutschland GmbH | 297 | 303 | 0 | 22 kW | 99 % |
| MVV Energie AG | 290 | 537 | 106 | 300 kW | 45 % |
| GETEC mobility solutions GmbH | 288 | 475 | 24 | 150 kW | 22 % |
| Stadtwerke Lübeck Energie GmbH | 288 | 574 | 42 | 300 kW | 70 % |
| Volkswagen AG - Werk Wolfsburg | 288 | 543 | 4 | 300 kW | 7 % |
| Parkraumgesellschaft Baden-Württemberg GmbH | 286 | 586 | 0 | 24 kW | 0 % |
| RhönEnergie Fulda GmbH | 279 | 556 | 7 | 200 kW | 95 % |
| ALDI Nord Deutschland Stiftung & Co. KG | 270 | 553 | 270 | 150 kW | 87 % |
| amba operations GmbH | 270 | 402 | 1 | 50 kW | 5 % |
| Stadtwerke Duisburg AG | 259 | 530 | 8 | 150 kW | 77 % |
| Zweckverband Region Schwäbische Alb | 259 | 259 | 0 | 11 kW | 0 % |
| GLS Mobility GmbH | 247 | 460 | 3 | 150 kW | 14 % |
| LEW Natur GmbH | 243 | 484 | 70 | 400 kW | 28 % |
| amperio GmbH | 242 | 450 | 100 | 400 kW | 74 % |
| VIOCON GmbH | 241 | 432 | 16 | 300 kW | 3 % |
| SWU Energie GmbH | 238 | 393 | 16 | 300 kW | 34 % |
| Comfortcharge GmbH | 235 | 620 | 196 | 200 kW | 9 % |
| Stadtwerke Bochum GmbH | 232 | 355 | 49 | 400 kW | 0 % |
| EAM Natur Energie GmbH | 226 | 402 | 113 | 400 kW | 34 % |
| Stadtwerke Heidelberg Energie GmbH | 224 | 405 | 5 | 50 kW | 0 % |
| Bilkraft GmbH | 221 | 442 | 219 | 400 kW | 95 % |
| ecowerk e-charge GmbH | 207 | 346 | 6 | 300 kW | 8 % |
| Osnabrücker Parkstätten-Betriebsgesellschaft mbH | 205 | 362 | 28 | 300 kW | 41 % |
| Fastned Deutschland GmbH & Co. KG | 204 | 404 | 204 | 400 kW | 0 % |
| envia Mitteldeutsche Energie AG | 199 | 396 | 37 | 200 kW | 0 % |
| Backcharge GmbH | 197 | 373 | 41 | 480 kW | 90 % |
| Stadtwerke Würzburg AG | 196 | 389 | 42 | 400 kW | 0 % |
| SWLB Mobilität GmbH | 186 | 377 | 16 | 300 kW | 0 % |
| infra fürth service gmbh | 186 | 364 | 11 | 300 kW | 11 % |
| Flughafen München GmbH | 183 | 375 | 1 | 150 kW | 0 % |
| Energieversorgung Oberhausen AG | 182 | 307 | 6 | 400 kW | 98 % |
| badenova AG & Co. KG | 180 | 353 | 5 | 150 kW | 18 % |
| Emscher Lippe Energie GmbH | 177 | 354 | 5 | 150 kW | 0 % |
| Westfalen AG & Co. KG | 174 | 278 | 87 | 400 kW | 0 % |
Why some operators have no page of their own: there is one from 3 charging stations upwards – below that it would hold nothing that the page of the individual charging station does not already say.