Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.
For 182 of the 226 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.
Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.
NürnbergMesse GmbH · +4991186060
Found automatically – uncertain. This contact was researched on the web automatically on 15 Oct 2026 and only matched against the source page by machine. Nobody has checked that it really belongs to this operator. The number on the station remains authoritative.
For operators: adding a contact requires an account. The address is confirmed and approved by hand before it appears.
Copy this snippet into your page: it shows your chargers around Nürnberg with power, occupancy (where you report it to the National Access Point) and a "report a fault" button. We forward the reports to the fault contact stored here. Free, no registration, no cookies.
View preview Choose place, radius and filters yourself
Place and radius can be changed in the address (lat, lon, radius up to 25 km). Questions welcome via the contact form.
Calculated from our own record of the register, as of 30 Sep 2026.
Share of all 211,253 charge points in the register. 0 charge points at 150 kW or above. 0 of 226 charge points.
What has changed since earlier editions. Periods without a matching comparison edition are listed below the table – a back-calculated figure would be made up.
| Period | Charge points | Change | Growth | Market share |
|---|---|---|---|---|
| 30 days | 226 |
0 0 added, 0 gone |
0.00 % |
0.11 %
0.00 Pp. |
| 29 days in fact, baseline 1 Sep 2026 | ||||
| 90 days | 226 |
0 0 added, 0 gone |
0.00 % |
0.11 %
0.00 Pp. |
| 85 days in fact, baseline 7 Jul 2026 | ||||
No comparison: 7 days, 12 months, 24 months. The Federal Network Agency publishes the register only about monthly, and for these periods no edition lies close enough to the reference date. A back-calculated figure would be made up.
Based on 4 snapshots of the charging point register kept here, from 7 Jul 2026 to 30 Sep 2026 – 85 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.
Grouped by address, strongest charge point first. 6 sites, page 1 of 1.
| Place | Address | kW | Charge points | Type | |
|---|---|---|---|---|---|
| 90471 Nürnberg | Messezentrum 1 NürnbergMesse GmbH |
22 | 128 53 units |
Standard charging station | Details |
| 90471 Nürnberg | Karl-Schönleben-Str. 70 NürnbergMesse GmbH |
22 | 62 31 units |
Standard charging station | Details |
| 90471 Nürnberg | Karl-Schönleben-Straße 65 NürnbergMesse GmbH |
22 | 12 4 units |
Standard charging station | Details |
| 90471 Nürnberg | Große Straße 1 NürnbergMesse GmbH |
22 | 8 2 units |
Standard charging station | Details |
| 90471 Nürnberg | Karl-Schönleben-Straße 70 NürnbergMesse GmbH |
22 | 8 2 units |
Standard charging station | Details |
| 90471 Nürnberg | Messezentrum 3 NürnbergMesse GmbH |
22 | 8 2 units |
Standard charging station | Details |
Erfahrungen mit Preisen, App, Kundenservice, Störungsbehebung – und Antworten des Betreibers selbst (bestätigte Betreiber-Konten tragen ein Abzeichen). Zu einzelnen Säulen gibt es eigene Diskussionen auf deren Seiten.
Teil des 💬 Forums › 🏢 Betreiber · Alle Säulen-Foren: 📍 Ladesäulen
Code in die eigene Seite kopieren (HTML-Block im CMS). Die eingestellte Ansicht wird mitgenommen. Den Quellenhinweis im Rahmen bitte stehen lassen – er ist die Bedingung für die freie Nutzung.