Otto-Ostrowski-Str. 1, 10249 Berlin
| Operator | Berliner Stadtwerke KommunalPartner GmbH |
|---|---|
| Charging station ID ⓘ | 1154254 |
| Type | Standard charging station |
| Strongest charge point | 22 kW |
| Grid connection capacity ⓘ | 30 kW |
| Charge points | 2 |
| Connector types | AC Type 2 socket |
| Payment | Online payment, RFID card |
| In service since | 2 Apr 2026 |
| Parking ⓘ | No restriction |
| District | Kreisfreie Stadt Berlin |
| Federal state | Berlin |
| Mobile coverage ⓘ | all 3 operators |
| Coordinates | 52.527379, 13.453510 |
| Source | Charging point register of the Bundesnetzagentur, as of 1 Sep 2026. |
Open around the clock.
| No. | Connector type | Power | EVSE-ID | Public key of the metering capsule |
|---|---|---|---|---|
| 1 | AC Type 2 socket | 22 kW | not filed |
cryptographically confirmed
prime192v1, 192 Bit
1C3B 4982 C19B CE3B…
|
| 2 | AC Type 2 socket | 22 kW | not filed |
cryptographically confirmed
prime192v1, 192 Bit
AB1A 3488 7DD6 5EBE…
|
The key is not in this table because it runs to up to 500 characters – it comes through the fetch link beside it.
🧾 Recheck a charging session here
Paste the signed record from your bill – the key for this charging station is already set. No installation, and nothing is stored. The authoritative tool remains the S.A.F.E. transparency software, which knows every approved format.
Since 3 Sep 2026 – that is 12 days – this charging station has been reporting "out of service" without interruption: 22 consecutive measurements, and in none of them was a charge point free, occupied or reserved.
No reason is known: the map service only reports that nothing works, not why. If you know what is wrong, report it – then it will show here.
Measured every four hours, counted from the last measurement showing a sign of life. The report comes from the map service, not from us and not from the operator – whether nothing works on site is known only to whoever drives there. If you have been: we welcome the correction.
From 22 of our own measurements since 3 Sep 2026. The darker the cell, the more often no charge point was free at that time. Grey cells mean: no measurements yet.
The register says that a station stands here. Whether you can get there with a trailer, whether there is light at night and whether the last attempt to charge worked, it does not say – only somebody who has been there can.
No feedback yet. You would be the first.
No verified fault number is on file for this operator. The register lists 11,755 different operators – the directory will never be complete. As a rule the number is printed on the station itself.
Do you operate this charging station? Add your fault contact – then it stands here, and reports reach you directly.
If everything here is occupied: 10 further charging stations within a kilometre.
All charging stations run by Berliner Stadtwerke KommunalPartner GmbH · Search the area from here · This data as JSON