Saaläckerstraße 2A, 63801 Kleinostheim
| Operator | Tesla Germany GmbH |
|---|---|
| Charging station ID ⓘ | 1100827 |
| Type | Rapid charging station |
| Strongest charge point | 250 kW |
| Grid connection capacity ⓘ | 250 kW |
| Charge points | 1 |
| Connector types | DC tethered cable, Combo 2 (CCS) |
| Payment | Online payment |
| In service since | 20 Mar 2023 |
| District | Landkreis Aschaffenburg |
| Federal state | Bayern |
| Mobile coverage ⓘ | all 3 operators |
| Coordinates | 49.994026, 9.070627 |
| Source | Charging point register of the Bundesnetzagentur, as of 1 Sep 2026. |
The operator has not filed any opening hours. That is the normal case – two thirds of the entries in the register leave the field empty. It means neither that the station is always accessible nor the opposite.
| No. | Connector type | Power | EVSE-ID | Public key of the metering capsule |
|---|---|---|---|---|
| 1 | DC tethered cable, Combo 2 (CCS) | 250 kW | not filed |
cryptographically confirmed
prime256v1, 256 Bit
5621 CC14 1680 3E79…
|
The key is not in this table because it runs to up to 500 characters – it comes through the fetch link beside it.
🧾 Recheck a charging session here
Paste the signed record from your bill – the key for this charging station is already set. No installation, and nothing is stored. The authoritative tool remains the S.A.F.E. transparency software, which knows every approved format.
Since 15 Sep 2026 – that is 1 days – this charging station has been reporting "out of service" without interruption: 1 consecutive measurements, and in none of them was a charge point free, occupied or reserved.
No reason is known: the map service only reports that nothing works, not why. If you know what is wrong, report it – then it will show here.
Measured every four hours, counted from the last measurement showing a sign of life. The report comes from the map service, not from us and not from the operator – whether nothing works on site is known only to whoever drives there. If you have been: we welcome the correction.
From 24 of our own measurements since 4 Sep 2026. The darker the cell, the more often no charge point was free at that time. Grey cells mean: no measurements yet.
The register says that a station stands here. Whether you can get there with a trailer, whether there is light at night and whether the last attempt to charge worked, it does not say – only somebody who has been there can.
No feedback yet. You would be the first.
No verified fault number is on file for this operator. The register lists 11,755 different operators – the directory will never be complete. As a rule the number is printed on the station itself.
Do you operate this charging station? Add your fault contact – then it stands here, and reports reach you directly.
If everything here is occupied: 10 further charging stations within a kilometre.
All charging stations run by Tesla Germany GmbH · Search the area from here · This data as JSON