District. Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.
Im Landkreis Cochem-Zell there are 80 public charging sites with 138 charge points in total. 13 of them charge at 50 kW or more, 8 even at 150 kW or more. The operator with the most sites is Westenergie Metering GmbH (10 sites).
Status report: Last month, operators reported 1.6 % of charge point time here as out of service (Germany: 2.3 %). 0 sites were down for a week or longer. Report for this district (German)
Each charging station is counted by its strongest charge point. A station with one 300 kW and one 22 kW connector sits in the top class.
Sorted by number of charging stations. Placed by coordinates, not by the town given in the register.
Grouped by address, strongest charge point first. 54 sites, page 2 of 2.
| Place | Address | Operator | kW | Charge points | |
|---|---|---|---|---|---|
| 56759 Kaisersesch | Hambucher Str. 4 | E.ON Drive Germany GmbH | 11 | 1 | Details |
| 56759 Kaisersesch | Koblenzerstraße 40 | Physiotherapie Natalie Helbach | 11 | 1 | Details |
| 56759 Kaisersesch | Wilhelm-Conrad-Röntgenstraße 22 | Martini's Kfz-Service GmbH & Co. KG | 11 | 1 | Details |
| 56254 Müden (Mosel) | Hauptstraße 24 | Mathias Wohlfarth | 11 | 1 | Details |
Code in die eigene Seite kopieren (HTML-Block im CMS). Die eingestellte Ansicht wird mitgenommen. Den Quellenhinweis im Rahmen bitte stehen lassen – er ist die Bedingung für die freie Nutzung.