District. Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.
In Wuppertal there are 264 public charging sites with 481 charge points in total. 74 of them charge at 50 kW or more, 60 even at 150 kW or more. The operator with the most sites is WSW Energie & Wasser AG (87 sites).
Status report: Last month, operators reported 1.5 % of charge point time here as out of service (Germany: 2.3 %). 0 sites were down for a week or longer. Report for this district (German)
Each charging station is counted by its strongest charge point. A station with one 300 kW and one 22 kW connector sits in the top class.
Grouped by address, strongest charge point first. 152 sites, page 4 of 4.
| Place | Address | Operator | kW | Charge points | |
|---|---|---|---|---|---|
| 42399 Wuppertal | Mispelweg 9 | Jochen Reuter | 11 | 1 | Details |
| 42281 Wuppertal | Bromberger Straße 28 | WSW Energie & Wasser AG | 4 | 1 | Details |
Code in die eigene Seite kopieren (HTML-Block im CMS). Die eingestellte Ansicht wird mitgenommen. Den Quellenhinweis im Rahmen bitte stehen lassen – er ist die Bedingung für die freie Nutzung.