District. Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.
In Remscheid there are 122 public charging sites with 227 charge points in total. 31 of them charge at 50 kW or more, 23 even at 150 kW or more. The operator with the most sites is Stadtwerke Remscheid GmbH (49 sites).
Status report: Last month, operators reported 2.4 % of charge point time here as out of service (Germany: 2.3 %). 0 sites were down for a week or longer. Report for this district (German)
Each charging station is counted by its strongest charge point. A station with one 300 kW and one 22 kW connector sits in the top class.
Grouped by address, strongest charge point first. 53 sites, page 2 of 2.
| Place | Address | Operator | kW | Charge points | |
|---|---|---|---|---|---|
| 42857 Remscheid | Kremenholl 43 | Sascha Schell | 11 | 1 | Details |
| 42859 Remscheid | Papenberg 10 | Carolin Gottschalk | 11 | 1 | Details |
| 42897 Remscheid | Karlstr. 2 | PRAXISFELD GmbH | 6 | 4 | Details |
Code in die eigene Seite kopieren (HTML-Block im CMS). Die eingestellte Ansicht wird mitgenommen. Den Quellenhinweis im Rahmen bitte stehen lassen – er ist die Bedingung für die freie Nutzung.