District. Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.
In Bottrop there are 127 public charging sites with 252 charge points in total. 25 of them charge at 50 kW or more, 17 even at 150 kW or more. The operator with the most sites is Emscher Lippe Energie GmbH (69 sites).
Status report: Last month, operators reported 0.1 % of charge point time here as out of service (Germany: 2.3 %). 0 sites were down for a week or longer. Report for this district (German)
Each charging station is counted by its strongest charge point. A station with one 300 kW and one 22 kW connector sits in the top class.
Grouped by address, strongest charge point first. 105 sites, page 3 of 3.
| Place | Address | Operator | kW | Charge points | |
|---|---|---|---|---|---|
| 46244 Bottrop | An der Sandgrube 28 | Andre Voßbeck | 11 | 1 | Details |
| 46244 Bottrop | Finkenweg 9 | Voelkel Immobilienverwaltung GmbH | 11 | 1 | Details |
| 46244 Bottrop | Pastor-Dahlmann-Str 21 | Andreas Riering | 11 | 1 | Details |
| 46236 Bottrop | Josef-Albers-Straße 70 | ubitricity Gesellschaft für verteilte Energiesysteme mbH | 4 | 1 | Details |
| 46240 Bottrop | Werkstraße 4 | Monty Beckmann | 3 | 1 | Details |