chargemyrideNot signed in Sign in

← All operators

Wasserwerk Vechta - Eigenbetrieb Stadt Vechta

Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.

34charging stations
53charge points
1of those 50 kW and above
75 kWstrongest charge point
1federal states

Power classes

unter 50 kW 33 (97.1 %)50 bis 149 kW 1 (2.9 %)

Verifiable billing

For 17 of the 53 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

32.1 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,790 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: adding a contact requires an account. The address is confirmed and approved by hand before it appears.

Are you the operator? Show your chargers on your website

Copy this snippet into your page: it shows your chargers around Vechta with power, occupancy (where you report it to the National Access Point) and a "report a fault" button. We forward the reports to the fault contact stored here. Free, no registration, no cookies.

View preview Choose place, radius and filters yourself

Place and radius can be changed in the address (lat, lon, radius up to 25 km). Questions welcome via the contact form.

In the German market

Calculated from our own record of the register, as of 30 Sep 2026.

0.03 % market share
22 kW median
1.2 MW installed capacity
22.8 kW average per charge point
0.0 % HPC share
3.8 % direct current

Share of all 211,253 charge points in the register. 0 charge points at 150 kW or above. 2 of 53 charge points.

Movement

What has changed since earlier editions. Periods without a matching comparison edition are listed below the table – a back-calculated figure would be made up.

Period Charge points Change Growth Market share
30 days 53 0
0 added, 0 gone
0.00 % 0.03 %
0.00 Pp.
29 days in fact, baseline 1 Sep 2026
90 days 53 +15
15 added, 0 gone
+39.47 % 0.03 %
+0.01 Pp.
85 days in fact, baseline 7 Jul 2026

No comparison: 7 days, 12 months, 24 months. The Federal Network Agency publishes the register only about monthly, and for these periods no edition lies close enough to the reference date. A back-calculated figure would be made up.

Where these figures come from

Based on 4 snapshots of the charging point register kept here, from 7 Jul 2026 to 30 Sep 2026 – 85 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 28 sites, page 1 of 1.

PlaceAddresskWCharge pointsType
49377 Vechta Kapitelplatz 8 75 4
2 units
Rapid charging station Details
49377 Vechta Am Schützenplatz 10 22 2 Standard charging station Details
49377 Vechta An der Gräfte 37 22 2 Standard charging station Details
49377 Vechta Bahnhofstr. 4 22 2 Standard charging station Details
49377 Vechta Buddenkämpe 43 22 2 Standard charging station Details
49377 Vechta Dominikaner Weg 45 22 2 Standard charging station Details
49377 Vechta Dornbusch 45 22 2 Standard charging station Details
49377 Vechta Große Str. 44 - 46 22 2 Standard charging station Details
49377 Vechta Immentun 2a 22 2 Standard charging station Details
49377 Vechta Kolpingstr. 17 22 2 Standard charging station Details
49377 Vechta Kolpingstr. 22 22 2 Standard charging station Details
49377 Vechta Lange Str. 29 22 2 Standard charging station Details
49377 Vechta Marienstr. 6 22 2 Standard charging station Details
49377 Vechta Oldenburger Str. 9 - 11 22 2 Standard charging station Details
49377 Vechta Oythe 12 22 2 Standard charging station Details
49377 Vechta Ravensbergerstr. 20 22 2 Standard charging station Details
49377 Vechta Theodor-Heuss-Str. 22 22 2 Standard charging station Details
49377 Vechta Willohstr. 19 22 2 Standard charging station Details
49377 Vechta Diekmanns Esch 2 22 1 Standard charging station Details
49377 Vechta Graskamp 1 22 1 Standard charging station Details
49377 Vechta Holzhausen 8 22 1 Standard charging station Details
49377 Vechta In der Paterei 10 22 1 Standard charging station Details
49377 Vechta Jans-Döpe 2 22 1 Standard charging station Details
49377 Vechta Maximilian-Kolbe-Str. 34 22 1 Standard charging station Details
49377 Vechta Oldenburger Str. 112 22 1 Standard charging station Details
49377 Vechta Oythe 25 22 1 Standard charging station Details
49377 Vechta Spitzenkamp 3 22 1 Standard charging station Details
49377 Vechta Johannesstr. 8 11 6
6 units
Standard charging station Details
28 sites

💬 Diskussion zu Wasserwerk Vechta - Eigenbetrieb Stadt Vechta

Erfahrungen mit Preisen, App, Kundenservice, Störungsbehebung – und Antworten des Betreibers selbst (bestätigte Betreiber-Konten tragen ein Abzeichen). Zu einzelnen Säulen gibt es eigene Diskussionen auf deren Seiten.

Teil des 💬 Forums › 🏢 Betreiber · Alle Säulen-Foren: 📍 Ladesäulen

‹/› Diese Seite auf der eigenen Webseite einbinden – kostenlos, aktualisiert sich selbst

Code in die eigene Seite kopieren (HTML-Block im CMS). Die eingestellte Ansicht wird mitgenommen. Den Quellenhinweis im Rahmen bitte stehen lassen – er ist die Bedingung für die freie Nutzung.

Vorschau des Rahmens →