chargemyrideNot signed in Sign in

← All operators

Überlandwerk Schäftersheim GmbH & Co. KG

Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.

23charging stations
47charge points
1of those 50 kW and above
50 kWstrongest charge point
2federal states

Power classes

unter 50 kW 22 (95.7 %)50 bis 149 kW 1 (4.3 %)

Verifiable billing

For 8 of the 47 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

17.0 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,790 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: adding a contact requires an account. The address is confirmed and approved by hand before it appears.

Are you the operator? Show your chargers on your website

Copy this snippet into your page: it shows your chargers around Weikersheim with power, occupancy (where you report it to the National Access Point) and a "report a fault" button. We forward the reports to the fault contact stored here. Free, no registration, no cookies.

View preview Choose place, radius and filters yourself

Place and radius can be changed in the address (lat, lon, radius up to 25 km). Questions welcome via the contact form.

In the German market

Calculated from our own record of the register, as of 30 Sep 2026.

0.02 % market share
22 kW median
1.0 MW installed capacity
23.2 kW average per charge point
0.0 % HPC share
4.3 % direct current

Share of all 211,253 charge points in the register. 0 charge points at 150 kW or above. 2 of 47 charge points.

Movement

What has changed since earlier editions. Periods without a matching comparison edition are listed below the table – a back-calculated figure would be made up.

Period Charge points Change Growth Market share
30 days 47 0
0 added, 0 gone
0.00 % 0.02 %
0.00 Pp.
29 days in fact, baseline 1 Sep 2026
90 days 47 0
0 added, 0 gone
0.00 % 0.02 %
0.00 Pp.
85 days in fact, baseline 7 Jul 2026

No comparison: 7 days, 12 months, 24 months. The Federal Network Agency publishes the register only about monthly, and for these periods no edition lies close enough to the reference date. A back-calculated figure would be made up.

Where these figures come from

Based on 4 snapshots of the charging point register kept here, from 7 Jul 2026 to 30 Sep 2026 – 85 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 22 sites, page 1 of 1.

PlaceAddresskWCharge pointsType
97990 Weikersheim Schulstr. 7 50 3 Rapid charging station Details
97239 Aub Am Roßmarkt - 22 4
2 units
Standard charging station Details
97993 Creglingen Kieselalle 0 22 2 Standard charging station Details
97253 Gaukönigshofen Hauptstraße 0 22 2 Standard charging station Details
97999 Igersheim Talstr. 0 22 2 Standard charging station Details
97268 Kirchheim Mergentheimer Str. 0 22 2 Standard charging station Details
97996 Niederstetten Frickentalplatz 0 22 2 Standard charging station Details
97996 Niederstetten Hauptstraße 50 22 2 Standard charging station Details
97199 Ochsenfurt Am Greinberg 29 22 2 Standard charging station Details
97199 Ochsenfurt Kniebreche 0 22 2 Standard charging station Details
97199 Ochsenfurt Parkplatz Brunnenstraße 0 22 2 Standard charging station Details
97199 Ochsenfurt Würzburger Straße 0 22 2 Standard charging station Details
97285 Röttingen Sonnenuhrweg 0 22 2 Standard charging station Details
97255 Sonderhofen Gelchsheimer Straße 5 22 2 Standard charging station Details
97990 Weikersheim Am Bahnhof 1 22 2 Standard charging station Details
97990 Weikersheim August-Laukhuff-Str. 0 22 2 Standard charging station Details
97990 Weikersheim Gartenstraße 0 22 2 Standard charging station Details
97990 Weikersheim Klosterhofstraße 3 22 2 Standard charging station Details
97990 Weikersheim Kreuzstr. 10 22 2 Standard charging station Details
97990 Weikersheim Molkereistr. - 22 2 Standard charging station Details
97990 Weikersheim Nelkenweg 2 22 2 Standard charging station Details
97990 Weikersheim Talstraße 2 22 2 Standard charging station Details
22 sites

💬 Diskussion zu Überlandwerk Schäftersheim GmbH & Co. KG

Erfahrungen mit Preisen, App, Kundenservice, Störungsbehebung – und Antworten des Betreibers selbst (bestätigte Betreiber-Konten tragen ein Abzeichen). Zu einzelnen Säulen gibt es eigene Diskussionen auf deren Seiten.

Teil des 💬 Forums › 🏢 Betreiber · Alle Säulen-Foren: 📍 Ladesäulen

‹/› Diese Seite auf der eigenen Webseite einbinden – kostenlos, aktualisiert sich selbst

Code in die eigene Seite kopieren (HTML-Block im CMS). Die eingestellte Ansicht wird mitgenommen. Den Quellenhinweis im Rahmen bitte stehen lassen – er ist die Bedingung für die freie Nutzung.

Vorschau des Rahmens →