chargemyride

← All operators

Stadtwerke Bogen GmbH

Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

20charging stations
40charge points
0of those 50 kW and above
22 kWstrongest charge point
1federal states

Power classes

unter 50 kW 20 (100.0 %)

Verifiable billing

For 2 of the 40 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

5.0 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.02 % market share
22 kW median
0.9 MW installed capacity
22.0 kW average per charge point
0.0 % HPC share
0.0 % direct current

Share of all 209,136 charge points in the register. 0 charge points at 150 kW or above. 0 of 40 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 40 0
0 added, 0 gone
0.00 % 0.02 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 15 sites, page 1 of 1s.

PlaceAddresskWCharge pointsType
94327 Bogen Güterstraße 1 22 4
2 units
Standard charging station Details
94327 Bogen Petersgewanne 1a 22 4
2 units
Standard charging station Details
94379 Sankt Englmar Bayerweg bei 7 22 4
2 units
Standard charging station Details
94379 Sankt Englmar Maibrunn 9a 22 4
2 units
Standard charging station Details
94379 St. Englmar Am Predigtstuhl bei 1 22 4
2 units
Standard charging station Details
94327 Bogen Agendorfer Str. 19 22 2 Standard charging station Details
94327 Bogen Bogenberg 12 22 2 Standard charging station Details
94327 Bogen Klosterhof 1 22 2 Standard charging station Details
94327 Bogen Kotaustraße 7 22 2 Standard charging station Details
94327 Bogen Mussinanstraße 21 22 2 Standard charging station Details
94327 Bogen Stadtplatz 23 22 2 Standard charging station Details
94327 Bogen Stadtplatz 39 22 2 Standard charging station Details
94354 Haselbach Straubinger Straße 19 22 2 Standard charging station Details
94360 Mitterfels Burgstraße 34 22 2 Standard charging station Details
94374 Schwarzach Schulstraße 4 22 2 Standard charging station Details
15 sites