Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

232charging stations
355charge points
49of those 50 kW and above
400 kWstrongest charge point
1federal states

Power classes

unter 50 kW 183 (78.9 %)50 bis 149 kW 21 (9.1 %)150 bis 299 kW 25 (10.8 %)ab 300 kW 3 (1.3 %)

Verifiable billing

For 0 of the 355 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

0.0 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.17 % market share
22 kW median
11.4 MW installed capacity
51.0 kW average per charge point
15.8 % HPC share
27.0 % direct current

Share of all 209,136 charge points in the register. 56 charge points at 150 kW or above. 96 of 355 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 355 +2
2 added, 0 gone
+0.57 % 0.17 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 113 sites, page 3 of 3s.

PlaceAddresskWCharge pointsType
44787 Bochum Viktoriastraße 23
Stadtwerke Bochum GmbH
11 11
11 units
Standard charging station Details
44787 Bochum Westring 26a
Stadtwerke Bochum GmbH
11 9
9 units
Standard charging station Details
44787 Bochum Luisenstraße 9
Stadtwerke Bochum GmbH
11 8
8 units
Standard charging station Details
44787 Bochum Ferdinandstraße 13
Stadtwerke Bochum GmbH
11 6
6 units
Standard charging station Details
44791 Bochum Stadionring 26
Stadtwerke Bochum GmbH
11 6
6 units
Standard charging station Details
44787 Bochum Massenbergstraße 15
Stadtwerke Bochum GmbH
11 5
5 units
Standard charging station Details
44791 Bochum Stadionring 20
Stadtwerke Bochum GmbH
11 4
4 units
Standard charging station Details
44866 Bochum An der Papenburg 4
Stadtwerke Bochum GmbH
11 2
2 units
Standard charging station Details
44787 Bochum Brückstraße 5
Stadtwerke Bochum GmbH
11 2
2 units
Standard charging station Details
44809 Bochum Dorstener Straße 400
Stadtwerke Bochum GmbH
11 2
2 units
Standard charging station Details
44787 Bochum Herner Straße 45
Stadtwerke Bochum GmbH
11 2 Standard charging station Details
44809 Bochum Riemker Straße 13
Stadtwerke Bochum GmbH
11 2 Standard charging station Details
44803 Bochum Wirmerstraße 28
Stadtwerke Bochum GmbH
11 2 Standard charging station Details
113 sites
← Back