chargemyride

← All operators

Sonnenstrom Saarpfalz OHG

Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

42charging stations
104charge points
24of those 50 kW and above
300 kWstrongest charge point
2federal states

Power classes

unter 50 kW 18 (42.9 %)50 bis 149 kW 12 (28.6 %)150 bis 299 kW 7 (16.7 %)ab 300 kW 5 (11.9 %)

Verifiable billing

For 66 of the 104 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

63.5 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.05 % market share
22 kW median
3.7 MW installed capacity
69.4 kW average per charge point
22.1 % HPC share
38.5 % direct current

Share of all 209,136 charge points in the register. 23 charge points at 150 kW or above. 40 of 104 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 104 0
0 added, 0 gone
0.00 % 0.05 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 15 sites, page 1 of 1s.

PlaceAddresskWCharge pointsType
66482 Zweibrücken Stockholmer Str. 8 300 28
9 units
Rapid charging station Details
66440 Blieskastel Florianstr. 28 300 12
5 units
Rapid charging station Details
66440 Blieskastel Auf Scharlen 4 300 6
4 units
Rapid charging station Details
66583 Spiesen-Elversberg Zum Nassenwald 1 150 6
2 units
Rapid charging station Details
66424 Homburg Hauptstr. 107 150 4
2 units
Rapid charging station Details
66440 Blieskastel Langwiese 8 150 2 Rapid charging station Details
66424 Homburg Am Forum 1 50 14
5 units
Rapid charging station Details
66679 Losheim am See Zum Stausee 194 50 12
4 units
Rapid charging station Details
66679 Losheim am See Merziger Str. 3 50 8
3 units
Rapid charging station Details
66440 Blieskastel Bahnhofstr. 3a 50 2 Rapid charging station Details
66453 Gersheim Bliesstr. 19A 50 2 Rapid charging station Details
66424 Homburg Entenmühlstr. 70 50 2
2 units
Rapid charging station Details
66453 Gersheim Keltenstr. 19 22 2 Standard charging station Details
66453 Gersheim Lothringer Str. 19 22 2 Standard charging station Details
66424 Homburg Talstr. 30 22 2 Standard charging station Details
15 sites