Figures from the charging point register of the Bundesnetzagentur, as of 30 Sep 2026.

2charging stations
4charge points
0of those 50 kW and above
22 kWstrongest charge point
1federal states

Power classes

unter 50 kW 2 (100.0 %)

Verifiable billing

For 0 of the 4 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

0.0 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

nonoxx pro GmbH · +4943212024023

lademanagement@nonoxxpro.de

Found automatically – uncertain. This contact was researched on the web automatically on 12 Oct 2026 and only matched against the source page by machine. Nobody has checked that it really belongs to this operator. The number on the station remains authoritative.

Change or extend the contact

For operators: adding a contact requires an account. The address is confirmed and approved by hand before it appears.

Are you the operator? Show your chargers on your website

Copy this snippet into your page: it shows your chargers around Wernigerode with power, occupancy (where you report it to the National Access Point) and a "report a fault" button. We forward the reports to the fault contact stored here. Free, no registration, no cookies.

View preview Choose place, radius and filters yourself

Place and radius can be changed in the address (lat, lon, radius up to 25 km). Questions welcome via the contact form.

In the German market

Calculated from our own record of the register, as of 30 Sep 2026.

0.15 % market share
22 kW median
5.6 MW installed capacity
21.3 kW average per charge point
1.3 % HPC share
8.1 % direct current

Share of all 211,253 charge points in the register. 4 charge points at 150 kW or above. 26 of 321 charge points.

Movement

What has changed since earlier editions. Periods without a matching comparison edition are listed below the table – a back-calculated figure would be made up.

Period Charge points Change Growth Market share
30 days 321 +4
4 added, 0 gone
+1.26 % 0.15 %
0.00 Pp.
29 days in fact, baseline 1 Sep 2026
90 days 321 +10
10 added, 0 gone
+3.22 % 0.15 %
0.00 Pp.
85 days in fact, baseline 7 Jul 2026

No comparison: 7 days, 12 months, 24 months. The Federal Network Agency publishes the register only about monthly, and for these periods no edition lies close enough to the reference date. A back-calculated figure would be made up.

Where these figures come from

Based on 4 snapshots of the charging point register kept here, from 7 Jul 2026 to 30 Sep 2026 – 85 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 1 sites, page 1 of 1.

PlaceAddresskWCharge pointsType
22880 Wedel Langenkamp 28
Nonoxx Pro GmbH
22 4
2 units
Standard charging station Details
1 sites

💬 Diskussion zu Nonoxx Pro GmbH

Erfahrungen mit Preisen, App, Kundenservice, Störungsbehebung – und Antworten des Betreibers selbst (bestätigte Betreiber-Konten tragen ein Abzeichen). Zu einzelnen Säulen gibt es eigene Diskussionen auf deren Seiten.

Teil des 💬 Forums › 🏢 Betreiber · Alle Säulen-Foren: 📍 Ladesäulen

‹/› Diese Seite auf der eigenen Webseite einbinden – kostenlos, aktualisiert sich selbst

Code in die eigene Seite kopieren (HTML-Block im CMS). Die eingestellte Ansicht wird mitgenommen. Den Quellenhinweis im Rahmen bitte stehen lassen – er ist die Bedingung für die freie Nutzung.

Vorschau des Rahmens →