Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

48charging stations
99charge points
43of those 50 kW and above
400 kWstrongest charge point
5federal states

Power classes

unter 50 kW 5 (10.4 %)50 bis 149 kW 1 (2.1 %)150 bis 299 kW 1 (2.1 %)ab 300 kW 41 (85.4 %)

Verifiable billing

For 10 of the 99 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

10.1 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.05 % market share
300 kW median
27.3 MW installed capacity
276.0 kW average per charge point
84.9 % HPC share
86.9 % direct current

Share of all 209,136 charge points in the register. 84 charge points at 150 kW or above. 86 of 99 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 99 +32
32 added, 0 gone
+47.76 % 0.05 %
+0.02 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 17 sites, page 1 of 1s.

PlaceAddresskWCharge pointsType
25364 Brande-Hörnerkirchen Steinstraße 2 400 4
2 units
Rapid charging station Details
25821 Breklum Husumer Straße 17a 400 4
2 units
Rapid charging station Details
23743 Grömitz Am Markt 1-3 400 4
2 units
Rapid charging station Details
18375 Ostseebad Prerow Bergstraße 4 400 4
2 units
Rapid charging station Details
25826 Sankt Peter-Ording Dreilanden 7b 400 4
2 units
Rapid charging station Details
23774 Heiligenhafen Industriestr. 3 300 8
4 units
Rapid charging station Details
24975 Husby Flensburger Str. 58 300 8
4 units
Rapid charging station Details
23628 Krummesse Beidendorfer Weg 30 300 8
4 units
Rapid charging station Details
22941 Bargteheide Am Redder 2 300 6
3 units
Rapid charging station Details
19230 Hagenow Robert-Stock-Str. 2 300 6
3 units
Rapid charging station Details
24109 Kiel Kurt-Schumacher-Platz 4 300 6
3 units
Rapid charging station Details
23714 Malente Bahnhofstr. 40 300 6
3 units
Rapid charging station Details
27711 Osterholz-Scharmbeck Hördorfer Weg 50 300 6
3 units
Rapid charging station Details
21465 Reinbek Liebigstraße 2 300 6
3 units
Rapid charging station Details
18435 Stralsund Hans-Fallada-Straße 1 300 2 Rapid charging station Details
19348 Perleberg August-Bebel-Straße 2 200 2 Rapid charging station Details
97228 Rottendorf Ostring 2-4 86 15
6 units
Rapid charging station Details
17 sites