chargemyride

← All operators

KommEnergieGmbH

Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

15charging stations
32charge points
1of those 50 kW and above
50 kWstrongest charge point
1federal states

Power classes

unter 50 kW 14 (93.3 %)50 bis 149 kW 1 (6.7 %)

Verifiable billing

For 0 of the 32 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

0.0 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.02 % market share
22 kW median
0.6 MW installed capacity
24.5 kW average per charge point
0.0 % HPC share
15.6 % direct current

Share of all 209,136 charge points in the register. 0 charge points at 150 kW or above. 5 of 32 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 32 0
0 added, 0 gone
0.00 % 0.02 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 15 sites, page 1 of 1s.

PlaceAddresskWCharge pointsType
82223 Eichenau Hauptplatz 7
KommEnergie GmbH
50 2 Rapid charging station Details
82223 Eichenau Budrio Allee 1
KommEnergie GmbH
49 2 Rapid charging station Details
82178 Puchheim Aubinger Weg 49
KommEnergie GmbH
49 2 Rapid charging station Details
82178 Puchheim Alte Bahnhofstr. 00
KommEnergie GmbH
22 4 Standard charging station Details
82223 Eichenau Bahnhofstraße 7
KommEnergie GmbH
22 2 Standard charging station Details
82223 Eichenau Emmeringer Str. 2
KommEnergie GmbH
22 2 Standard charging station Details
82194 Gröbenzell Bahnhofstr. 5
KommEnergie GmbH
22 2 Standard charging station Details
82194 Gröbenzell Kirchenstr. 12
KommEnergie GmbH
22 2 Standard charging station Details
82194 Gröbenzell Oppelner Str. 3-5
KommEnergie GmbH
22 2 Standard charging station Details
82178 Puchheim Am Grünen Markt 7
KommEnergie GmbH
22 2 Standard charging station Details
82178 Puchheim Bürgermeister-Ertl-Str. 2
KommEnergie GmbH
22 2 Standard charging station Details
82178 Puchheim Bürgermeister-Ertl-Straße 2
KommEnergie GmbH
22 2 Standard charging station Details
82178 Puchheim Dornierstr. 0
KommEnergie GmbH
22 2 Standard charging station Details
82178 Puchheim Ringpromenade 0
KommEnergie GmbH
22 2 Standard charging station Details
82194 Gröbenzell Industriestr. 29-31
KommEnergie GmbH
11 2 Standard charging station Details
15 sites