chargemyride

← All operators

Kaufland Dienstleistung GmbH & Co. KG

Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

466charging stations
1,128charge points
455of those 50 kW and above
365 kWstrongest charge point
16federal states

Power classes

unter 50 kW 11 (2.4 %)50 bis 149 kW 451 (96.8 %)150 bis 299 kW 3 (0.6 %)ab 300 kW 1 (0.2 %)

Verifiable billing

For 922 of the 1,128 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

81.7 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.54 % market share
50 kW median
37.1 MW installed capacity
45.2 kW average per charge point
0.7 % HPC share
60.4 % direct current

Share of all 209,136 charge points in the register. 8 charge points at 150 kW or above. 681 of 1,128 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 1,128 0
0 added, 0 gone
0.00 % 0.54 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 411 sites, page 9 of 9s.

PlaceAddresskWCharge pointsType
90530 Wendelstein Rother Str. 1b
Kaufland
50 2 Rapid charging station Details
97877 Wertheim Bismarckstraße 26
Kaufland
50 2 Rapid charging station Details
42329 Wuppertal Kaiserstr. 39
Kaufland
50 2 Rapid charging station Details
78658 Zimmern ob Rottweil Raiffeisenstr. 2-4
Kaufland
50 2 Rapid charging station Details
08066 Zwickau Äußere Dresdner Str. 25
Kaufland
50 2 Rapid charging station Details
51109 köln-Mehrheim Ostmerheimer Straße 198
Kaufland
50 2 Rapid charging station Details
74613 Öhringen Haagweg 11
Kaufland
50 2 Rapid charging station Details
72160 Horb am Neckar Bahnhofplatz 15
Kaufland
40 2 Rapid charging station Details
22547 Hamburg Eckhoffplatz 1
Kaufland
30 3 Rapid charging station Details
81673 München Berg-am-Lain-Straße 117
Kaufland
22 2 Standard charging station Details
74172 Neckarsulm Rötelstr. 35
Kaufland
22 2 Standard charging station Details
411 sites