Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

586charging stations
1,115charge points
9of those 50 kW and above
150 kWstrongest charge point
5federal states

Power classes

unter 50 kW 577 (98.5 %)50 bis 149 kW 8 (1.4 %)150 bis 299 kW 1 (0.2 %)

Verifiable billing

For 485 of the 1,115 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

43.5 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.53 % market share
22 kW median
24.4 MW installed capacity
22.3 kW average per charge point
0.2 % HPC share
1.0 % direct current

Share of all 209,136 charge points in the register. 2 charge points at 150 kW or above. 11 of 1,115 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 1,115 +10
10 added, 0 gone
+0.90 % 0.53 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 516 sites, page 11 of 11s.

PlaceAddresskWCharge pointsType
88364 Wolfegg Am Hofgarten 1 22 2 Standard charging station Details
91639 Wolframs-Eschanbach Gartenstraße 1 22 2 Standard charging station Details
91639 Wolframs-Eschenbach Obere Gasse 2 22 2 Standard charging station Details
75449 Wurmberg Uhlandstr. 15 22 2 Standard charging station Details
73116 Wäschenbeuren Hockengasse 1 22 2 Standard charging station Details
74374 Zaberfeld Michelbacher Straße 5 22 2 Standard charging station Details
73119 Zell u. A. Göppinger Str. 28 22 2 Standard charging station Details
78658 Zimmern ob Rottweil Rathausstr. 2 22 2 Standard charging station Details
76684 Östringen Leiberg II 7 22 2 Standard charging station Details
76470 Ötigheim Industriestraße 42 22 2 Standard charging station Details
76470 Ötigheim Kronenstraße 4 22 2 Standard charging station Details
75365 Calw Jahnstraße 10 22 1 Standard charging station Details
72221 Haiterbach Industriestraße 52 22 1 Standard charging station Details
71088 Holzgerlingen Astrid-Lindgren-Straße 24-26 22 1 Standard charging station Details
72218 Wildberg Calwer Straße 304 22 1 Standard charging station Details
76532 Baden-Baden Wilhelm-Drapp-Str. 19 11 12
6 units
Standard charging station Details
516 sites