chargemyride

← All operators

Bürgerkraftwerke Stein GmbH

Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

19charging stations
37charge points
1of those 50 kW and above
50 kWstrongest charge point
1federal states

Power classes

unter 50 kW 18 (94.7 %)50 bis 149 kW 1 (5.3 %)

Verifiable billing

For 17 of the 37 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

45.9 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.02 % market share
22 kW median
0.8 MW installed capacity
23.5 kW average per charge point
0.0 % HPC share
5.4 % direct current

Share of all 209,136 charge points in the register. 0 charge points at 150 kW or above. 2 of 37 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 37 +2
2 added, 0 gone
+5.71 % 0.02 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 14 sites, page 1 of 1s.

PlaceAddresskWCharge pointsType
90547 Stein Deutenbacher Str. 2
Bürgerkraftwerke Stein
50 2 Rapid charging station Details
90547 Stein Goethering 27
Bürgerkraftwerke Stein
22 7
4 units
Standard charging station Details
91189 Rohr Am Golfplatz 1
Bürgerkraftwerke Stein
22 4
2 units
Standard charging station Details
90547 Stein Albertus-Magnus-Str. 33
Bürgerkraftwerke Stein
22 4
2 units
Standard charging station Details
90547 Stein Am Jakobsweg 15
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Deutenbacher Straße 2a
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Deutenbacherstraße 28
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Hauptstraße 56
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Jagdweg 48
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Jagdweg 50a
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Knauppstraße 23
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Knauppstraße 25
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Meierei 46
Bürgerkraftwerke Stein
22 2 Standard charging station Details
90547 Stein Mühlstraße 45
Bürgerkraftwerke Stein
22 2 Standard charging station Details
14 sites