chargemyride

← All operators

Allgäuer Überlandwerk GmbH

Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

80charging stations
156charge points
37of those 50 kW and above
300 kWstrongest charge point
1federal states

Power classes

unter 50 kW 43 (53.8 %)50 bis 149 kW 26 (32.5 %)150 bis 299 kW 8 (10.0 %)ab 300 kW 3 (3.8 %)

Verifiable billing

For 78 of the 156 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

50.0 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.07 % market share
22 kW median
4.9 MW installed capacity
53.4 kW average per charge point
12.8 % HPC share
45.5 % direct current

Share of all 209,136 charge points in the register. 20 charge points at 150 kW or above. 71 of 156 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 156 0
0 added, 0 gone
0.00 % 0.07 %
-0.01 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 67 sites, page 2 of 2s.

PlaceAddresskWCharge pointsType
87435 Kempten (Allgäu) Bahnhofplatz 0 22 2 Standard charging station Details
87647 Kraftisried Dorfstraße 8 22 2 Standard charging station Details
87547 Missen Hauptstraße 26 22 2 Standard charging station Details
87484 Nesselwang Von-Lingg-Straße 30 22 2 Standard charging station Details
87527 Ofterschwang Panoramaweg 0 22 2 Standard charging station Details
87466 Oy-Mittelberg Thalstr. 28-30 22 2 Standard charging station Details
87448 Waltenhofen Sonnenstr. 1 A 22 2 Standard charging station Details
87484 nesselwang Bürgermeister-Martin-Straße 9 22 2 Standard charging station Details
87435 Altusried Im Schönen Grund 6 22 1 Standard charging station Details
88167 Grünenbach Ebratshofen 24 22 1 Standard charging station Details
87466 Oy- Mittelberg Mittelburgweg 1 22 1 Standard charging station Details
87672 Roßhaupten Kirchweg 6 22 1 Standard charging station Details
87561 Oberstdorf Faistenoy 10 11 4
2 units
Standard charging station Details
87487 Ermengerst Römerstraße 2 11 2 Standard charging station Details
87435 Kempten (Allgäu) Aybühlweg 58 11 2 Standard charging station Details
87494 Rückholz Schönewald Str. 5 11 2 Standard charging station Details
87487 Wiggensbach Kempter Straße 3 11 2 Standard charging station Details
67 sites
← Back