chargemyride

← All operators

AGRAVIS Raiffeisen Tankstellen GmbHwww.

Figures from the charging point register of the Bundesnetzagentur, as of 1 Sep 2026.

12charging stations
33charge points
2of those 50 kW and above
150 kWstrongest charge point
2federal states

Power classes

unter 50 kW 10 (83.3 %)150 bis 299 kW 2 (16.7 %)

Verifiable billing

For 0 of the 33 charge points the register holds a public key for the metering capsule that can be confirmed cryptographically.

0.0 %

Without that key a signed charging session cannot be checked against the bill. A low rate is a reporting problem first, not a billing one – but it still leaves you unable to do the arithmetic.

Fault contact

No verified fault number is on file for this operator. The directory is maintained by hand and covers the large providers – with 11,755 operators in the register it will never be complete. As a rule the number is printed on the station itself.

Add a fault contact

For operators: the address is confirmed and approved by hand before it appears.

In the German market

Calculated from our own record of the register, as of 1 Sep 2026.

0.02 % market share
11 kW median
0.7 MW installed capacity
29.5 kW average per charge point
12.1 % HPC share
12.1 % direct current

Share of all 209,136 charge points in the register. 4 charge points at 150 kW or above. 4 of 33 charge points.

Movement

What has changed since earlier snapshots. Periods without a matching baseline are listed with the reason instead of a figure – an extrapolated number would be made up.

Period Charge points Change Growth Market share
7 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 35 Tage zurück, gesucht waren 7 (± 7). Die Aufzeichnung reicht 56 Tage zurück.
30 days 33 0
0 added, 0 gone
0.00 % 0.02 %
0.00 Pp.
35 days in fact, baseline 28 Jul 2026
90 days Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 90 (± 32). Die Aufzeichnung reicht 56 Tage zurück.
12 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 365 (± 128). Die Aufzeichnung reicht 56 Tage zurück.
24 months Kein Stand nahe genug am Stichtag: der nächstgelegene liegt 56 Tage zurück, gesucht waren 730 (± 256). Die Aufzeichnung reicht 56 Tage zurück.

Where these figures come from

Based on 3 snapshots of the charging point register kept here, from 7 Jul 2026 to 1 Sep 2026 – 56 days on record. Comparisons are always snapshot against snapshot; between two snapshots this analysis knows nothing.

Sites

Grouped by address, strongest charge point first. 8 sites, page 1 of 1s.

PlaceAddresskWCharge pointsType
52391 Vettweiß An der Tankstelle 2
AGRAVIS
150 4
2 units
Rapid charging station Details
27321 Thedinghausen Auf dem Rövekamp 11
AGRAVIS
150 2 Rapid charging station Details
49143 Bissendorf Bahnhofstr. 28c
AGRAVIS
22 4 Standard charging station Details
49324 Melle Werkstr. 6
AGRAVIS
22 1 Standard charging station Details
48155 Münster Industrieweg 110
AGRAVIS
11 16
4 units
Standard charging station Details
49808 Lingen Darmer Hafenstraße 8
AGRAVIS
11 2 Standard charging station Details
49324 Melle Werkstraße 6
AGRAVIS
11 2 Standard charging station Details
52388 Nörvenich Bahnhofstraße 70
AGRAVIS
11 2 Standard charging station Details
8 sites