🛵E-scooter / e-bike: domestic socket according to the operator
This location is outside Germany. The information comes from Base nationale des IRVE, transport.data.gouv.fr (Frankreich, Licence Ouverte 2.0). Reliability, occupancy over the day and calibration-law data are not yet available for it.
Charge points
FRMBIEVAPJI1
status unknown · since 24.11. 15:41
FRMBIEVAPJI2
status unknown · since 24.11. 15:41
On site: what it looks like
Drawing: AC charging post with 2 charge points. Estimated from power, current type and connectors – not a photo of the real charger.