chargemyrideNot signed in Sign in

TotalEnergies

Hauptstraße 42a, 99994 Nottertal-Heilinger Höhen

❔ Live status unknown: the operator is not reporting a status for this charger right now.

0.65 €/kWh without a contract, as reported by the operator

Directions here 🔍 Chargers nearby
75 kWStrongest charge point
2Charge points
CCSConnector types

This location is not in the Federal Network Agency's charging register. The information comes from Eco-Movement. Reliability, occupancy over the day and calibration-law data are therefore not available here.

Charge points

–no current report 0.65 €/kWh
–no current report 0.65 €/kWh

On site: what it looks like

Drawing: fast charger with cables, 2 charge points.75kWCCS
Drawing: fast charger with cables, 2 charge points. Estimated from power, current type and connectors – not a photo of the real charger.

🚶 Open in Google Street View 🗺 OpenStreetMap