❔ Live status unknown: the operator is not reporting a status for this charger right now.
approx. 0.48 €/kWh without a contract – estimated: this operator's usual price, not published for this station
Erlengrund 3, 63773 Goldbach
LGS-081-01
No account needed. “My stations” then always shows whether it is working right now.
★ Saved. Under My stations you can always see whether it is working right now – and what is free nearby if it is not.
Saved in this browser only. With a free account your shortlist follows you to every device – and you can be notified when the station is available again or a fault is reported.
🔔 Tip: Charge here often? With “Notify me of outages” we let you know on this device when the charger breaks down and when it works again – no account needed.
ALDI SÜD (in the register: ALDI SÜD Immobilienverwaltungs-SE & Co. oHG)
Found automatically – uncertainFound automatically – uncertain. This contact was researched on the web automatically on 8 Oct 2026 and only matched against the source page by machine. Nobody has checked that it really belongs to this operator. The number on the station remains authoritative. Matched through the operator code DEALD from the EVSE ID.
You need a confirmed account for this – so it is clear who every hint comes from.
Prepare a report All about this operator
Do you operate this charging station? Add your contact yourself – it will then show here as “provided by the operator”.
| No. | Connector type | Power | EVSE-ID | Public key of the metering capsule |
|---|---|---|---|---|
| 1 | DC tethered cable, Combo 2 (CCS) | 50 kW | DE*ALD*E23638 |
cryptographically confirmed
secp256k1, 256 Bit
0DE5 7F82 EBD6 62F6…
|
| 2 | DC tethered cable, Combo 2 (CCS) | 50 kW | DE*ALD*E23639 |
cryptographically confirmed
secp256k1, 256 Bit
15DE CE9E ED2A BFB0…
|
The key is not in this table because it runs to up to 500 characters – it comes through the fetch link beside it.
🧾 Recheck a charging session here
Paste the signed record from your bill – the key for this charging station is already set. No installation, and nothing is stored. The authoritative tool remains the S.A.F.E. transparency software, which knows every approved format.
Nobody has documented anything about this charger yet. You would be the first — up to 65 points are waiting here.
Did charging work? Tick lighting, roof, toilets +10Photo of the charger +10Check the QR code +10Check an invoice +20Add the fault hotline +10Write a question or tip +5
Points and the monthly ranking need an account. Sign in or create an account
Nobody has collected points this month yet — first place is open. 7 days left.
Points and the monthly ranking need an account. Sign in or create an account
🖨️ Print a sign with a QR code for this charger — for property owners who want to show guests whether the charger works.
| Operator | ALDI SÜD Immobilienverwaltungs-SE & Co. oHG |
|---|---|
| Charging station ID ⓘ | 1165755 |
| Type | Rapid charging station |
| Strongest charge point | 50 kW |
| Grid connection capacity ⓘ | 50 kW |
| Charge points | 2 |
| Connector types | DC tethered cable, Combo 2 (CCS) |
| Payment | Credit card (contactless), Credit card (reader), Debit card (reader), Debit card (contactless), RFID card |
| In service since | 31 Aug 2026 |
| Parking ⓘ | No restriction |
| District | Landkreis Aschaffenburg |
| Federal state | Bayern |
| Coordinates | 49.997370, 9.190610 |
| Source | Charging point register of the Bundesnetzagentur, as of 12 Nov 2026. |
Need this data for your own application? All chargers are available via the API, measured occupancy as a dataset – instead of page by page.
3 of 4 networks provide 4G here. Starting via app and paying by QR code should work.
Telekom, Vodafone, O2 and 1&1 networks in the 100 m grid cell around the charger, according to the Federal Network Agency's mobile coverage monitoring, as of 06/2026 (© Bundesnetzagentur). This describes your phone's reception, not the charger's own connection; reception in underground car parks is often worse.
🚶 Open in Google Street View
🛰 Aerial view
📷 Mapillary
The buttons open the respective service; no data is sent there beforehand.
No invoice has been checked here yet. Check an invoice from this station – the result feeds anonymously into the rating.
Tipps, Fragen und Erfahrungen – was das Register nicht weiß: Kabellänge, Zufahrt, Schranke, welche Karte geht, wer hilft bei Störungen. Eine kurze Erfahrung hilft allen, die als Nächste hierher fahren. Zum Betreiber gibt es eine eigene Runde: Diskussion zu ALDI SÜD Immobilienverwaltungs-SE & Co. oHG.
Teil des 💬 Forums › 📍 Ladesäulen · Allgemeine Fragen zum Laden: ⚡ Laden unterwegs · 🔧 Technik
The register says that a station stands here. Whether you can get there with a trailer, whether there is light at night and whether the last attempt to charge worked, it does not say – only somebody who has been there can.
No feedback yet. You would be the first.
🔒 Feedback requires signing in
Feedback is shown publicly on the station page and counts towards its rating. To stop anyone from anonymously pushing a station up or down, a (free) account is required.
There is no photo of this charger yet. A picture shows others exactly where it is.
You need a free account for this. You decide whether your name is shown below the picture.
The operator’s fault contact is at the top of this page. Here you prepare a report to send to the operator and, if you like, to the Federal Network Agency.
If everything here is occupied: 8 further charging stations within a kilometre.
All charging stations run by ALDI SÜD Immobilienverwaltungs-SE & Co. oHG · Search the area from here · This data as JSON