Municipality in Landkreis Bad Tölz-Wolfratshausen. Figures from the charging point register of the Bundesnetzagentur, as of 12 Nov 2026.
In Wackersberg there are 5 public charging sites with 14 charge points in total. 1 of them charge at 50 kW or more, 1 even at 150 kW or more. The operator with the most sites is 17er Oberlandenergie GmbH (4 sites).
Search on the map Radius search from the centre of Wackersberg, with occupancy and filters.
Each charging station is counted by its strongest charge point. A station with one 300 kW and one 22 kW connector sits in the top class.
Grouped by address, strongest charge point first. 5 sites, page 1 of 1.
| Place | Address | Operator | kW | Charge points | |
|---|---|---|---|---|---|
| 83646 Bad Tölz | Arzbacher Str. 0 | Stadtwerke Bad Tölz GmbH | 200 | 2 | Details |
| 83646 Wackersberg | Am Blomberg 0 | 17er Oberlandenergie GmbH | 22 | 4 | Details |
| 83646 Wackersberg | Am Hoheneck 0 | 17er Oberlandenergie GmbH | 22 | 4 | Details |
| 83646 Wackersberg | Kalkofenstr. 0 | 17er Oberlandenergie GmbH | 22 | 2 | Details |
| 83646 Wackersberg | Lehenstr. 0 | 17er Oberlandenergie GmbH | 22 | 2 | Details |
Each charging station is placed by its coordinates, not by the town the operator entered – "Garching", "Garching b. München" and "Garching bei München" all end up in the same municipality. Municipal boundaries: © GeoBasis-DE / BKG (2026), dl-de/by-2.0.
Quelle: chargemyride.live – vollständige Seite und alle Auswertungen →
Master data: Bundesnetzagentur.de, charging point register, as of 12 Nov 2026, licensed under CC BY 4.0. The data has been changed: grouped by site, de-duplicated and extended with our own analyses by chargemyride.live.